BYD logo

BYD

Last updated February 1, 2026
720
Innovation Areas
34,443
Inventors
189
Collaborations

Distributed linkage network control: BYDRecent Research Landscape

Desynchronized door operation at high-traffic transit hubs causes boarding delays and safety risks. This system integrates server-terminal batch configurations to enforce precise temporal alignment between train and platform barriers.

What technical problems is BYD addressing in Distributed linkage network control?

Inaccurate train positioning and synchronization

(85)evidences

Inconsistent speed and coordinate measurements lead to unsafe operational gaps. Reliable spatial awareness prevents collisions and optimizes headway.

Inconsistent rail system data integration

(56)evidences

Fragmented data processing and alarm monitoring in distributed rail systems lead to suboptimal site selection and resource utilization. Resolving these inefficiencies ensures system-wide operational reliability and reduced latency.

Turnout switching synchronization failure

(49)evidences

Inconsistent status data between zone controllers and on-board units leads to operational delays or safety hazards. Synchronizing turnout state detection prevents collision risks and throughput bottlenecks.