Dynamic headway interval control logic: BYDRecent Research Landscape
Fixed schedules cause cascading delays and energy waste when passenger loads or track conditions fluctuate. This lever enables real-time adjustment of departure and running intervals to maintain network flow.
What technical problems is BYD addressing in Dynamic headway interval control logic?
Inconsistent train headway intervals
(88)evidences
Errors in coordinate systems and speed measurement failures lead to unsafe headway gaps. Precise spatial awareness prevents collisions and operational delays.
Interlocking command execution failure
(87)evidences
Inconsistent or delayed communication between on-board units and zone controllers regarding turnout positions creates safety gaps. Resolving this prevents operational bottlenecks and collision risks in automated rail systems.