Modular pier connection interfaces: BYDRecent Research Landscape

Traditional cast-in-place bridge assembly causes significant project delays and labor costs. These innovations utilize modular cap-to-pier interlocking geometries to accelerate onsite structural integration.

What technical problems is BYD addressing in Modular pier connection interfaces?

Inadequate track interface stability

(23)evidences

Weakness at the interface of prefabricated rail components leads to structural shifting and safety hazards. Ensuring rigid connectivity prevents mechanical failure under dynamic vehicle loads.

Slow bridge substructure assembly

(7)evidences

Conventional cast-in-place pier and cap construction requires extensive onsite curing time and labor. Accelerating the assembly of these interfaces reduces traffic disruption and construction timelines.