BYD logo

BYD

Last updated February 1, 2026
720
Innovation Areas
34,443
Inventors
189
Collaborations

Redundant interlocking turnout controllers: BYDRecent Research Landscape

Mechanical failure in rail switching systems causes derailment risks and operational downtime. These innovations utilize localized object controller logic to synchronize turnout state detection with vehicle on-board signaling.

What technical problems is BYD addressing in Redundant interlocking turnout controllers?

Inaccurate train positioning data

(96)evidences

Discrepancies between coordinate systems and sensor failures lead to unreliable speed and location tracking. Resolving this prevents collisions and enables higher operational density.

Unreliable rail system monitoring

(29)evidences

Fragmented or delayed detection of system failures in rail transit leads to operational downtime. Centralizing and automating alarm processing prevents catastrophic infrastructure failure.

Undetected rail transit abnormalities

(21)evidences

Undetected physical anomalies and obstacles on rail lines lead to catastrophic derailments. Mitigating these risks ensures operational safety and prevents vehicle damage.

Switching command execution failure

(20)evidences

Inconsistent state data between zone controllers and on-board units leads to safety hazards and operational delays. Resolving this ensures reliable track switching and prevents derailments or route conflicts.