Truss-stiffened modular lifting architecture: MarsRecent Research Landscape
Manual handling of heavy battery packs during assembly creates significant safety risks and throughput bottlenecks. Engineering an optimized mobile platform stabilizes the transport load to prevent cell damage and accelerate line speed.
What technical problems is Mars addressing in Truss-stiffened modular lifting architecture?
Structural instability under heavy loads
(8)evidences
Mechanical failure or collapse occurs when moving large modular components across uneven surfaces. Eliminating structural buckling ensures safe deployment of heavy equipment in dynamic environments.
Excessive aerodynamic drag forces
(8)evidences
Inadequate structural stability during the movement of dense energy storage units. Eliminating mechanical instability ensures safe high-capacity material handling.