Polyurethane cementitious hybrid matrix: SikaRecent Research Landscape
Surface defects and poor workability in industrial flooring lead to high labor costs and structural failure. Precise control of the three-component chemical stoichiometry prevents gas entrapment and blister formation during the curing process.
What technical problems is Sika addressing in Polyurethane cementitious hybrid matrix?
Poor application workability
(10)evidences
Entrapped gas and moisture sensitivity cause structural voids and surface defects during application. Eliminating these failures ensures monolithic integrity and aesthetic consistency in industrial flooring.
Substrate adhesion and aesthetic degradation
(10)evidences
Accumulated static electricity on industrial surfaces causes equipment interference and ignition risks. Mitigating these discharges ensures operational safety and electronic component integrity.